Pump after the bid need what data to users

by:J&T     2021-01-15

the pump after the bid what data to need, the pump need to provide what data is in the water pump after the bid tendering stage usually have the tender documents require the pump after the bid what data to need, concrete pump after the bid need to provide what information you can refer to the following the user's bidding case requirements:

( 1) Bidders should provide the meet after the contract was signed installation and operation and maintenance of all the drawings, the use of maintenance manual, operation manual, etc. All the technical documents.

( 2) All information submitted to the owner of 6 copies of Chinese.

( 3) Provide the complete equipment of random packing materials. Include: equipment foundation, load data; Power distribution system diagram, control diagram, terminal wiring diagram, cable list, electricity load list.

( 4) Shall be provided to the owner, design institute, technical documents and drawings, that could satisfy the requirement of construction drawing design documents shall at the request of the design institute of construction drawing design comprehensive progress within the time limit provided to design institute. Provided documents shall include but not limited to the following contents:

technical data ( Deliverables, schedule and quantity) X.

to submit data name

submit time

submit party

the receiver

provide copies

1

device layout design

the winning 10 days

the

the buyer and the design institute

6

two

device, load data and ventilation, water supply, drainage, lighting, power supply design requirements, system control and interlock protection requirements

within 10 days after the winning

the

the buyer and representative

6

3

device of power distribution system diagram, control diagram, terminal wiring diagram, cable list, dimension and installation dimension diagram, installation, construction map

within 10 days after the winning

the

the buyer and representative

6

4

installation, maintenance and operation manuals and instructions, the computer control system software, such as

goods to

the

the buyer and representative

6

( 5) Reports and certificates

& middot; Equipment design and manufacture of the acceptance certificate.

· Equipment inspection report and the certificate of quality.

· Operation and maintenance manual

all bidders should provide mechanical and electrical equipment and equipment operation and maintenance manual of the control system, used to guide the staff test, commissioning, operation and equipment maintenance, the instruction manual, maintenance manual, including manufacturing equipment operation instruction manual and concise data manual.

it is important to note, in addition some project subject to tender is diving sludge pumps and some sales don't know what to choose options: actually WQ submersible pump can know about the proportion of medium if than big power increase.

and tender inside explain only performance parameters and requirement of centrifugal pump, so as far as possible selection for the user cost savings as far as possible when considering options: ISG centrifugal water pump

recommended reading: pump news article

the article about water pump after winning what data need to pump industry issued by the professional pump company.


Whether it's automation or artificial intelligence, the rapid convergence of technology and business often determines submersible pump’s competitiveness.
J&T INDUSTRY CO.,LTD. is committed to supplying the consumer and our customers with the finest, high-quality products and to leading the industry in submersible pump winter cover pump.
J&T INDUSTRY CO.,LTD. believes that the average profitability will be sufficient.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: