Diesel pump unit operation request

by:J&T     2020-07-23
Diesel pump unit operation request launched operation request:

when starting diesel engine water pump for the first time, check all equipment device, according to the following request for a:

from filler to infuse engine oil, diesel engine and pump suspension and ruler to check the oil level, oil conforms to the request height;

from the expansion tank to participate in the cooling water, diesel engine to two-thirds of expansion tank water level Gao Weiyi;

loaded diesel inside the fuel tank, pressure exhaust hand water pump, make diesel oil through a filter into the machine;

join import and export pipeline pump and gate valve, sealing pipe gate valve, water outlet pressure gauge and vacuum pressure gauge;

to the water pump and pressure pipe irrigation or vacuum water diversion, and emptying the internal air;

open circulating cooling water valve;

when appears one of the following situations, the charging time allows extended appropriately.

at the inlet valve fully open, the water valve closed cases, starting diesel pumps, when the diesel engine to reach normal speed, then gradually open the valves on the outlet pipe, and regulate to the desired operating mode.

diesel oil pumping units of the battery is the most important part, didn't it represents could not be started normal diesel pumps, therefore, in use at ordinary times should pay attention to strengthening start-up battery maintenance, today he said for diesel engine pump start-up battery maintenance method.

diesel engine pump start-up battery maintenance note:

in the recharge the battery for the first time, should pay attention to continuous charging time should not exceed 4 hours, charging time is too long will damage to the battery service life.

diesel engine pump battery storage time more than 3 months, the charging time for 8 hours.

environmental temperature that persists for more than 30 ℃ ( 86°F) Or relative humidity remains above 80%, charging time is 8 hours.

such as battery storage time more than 1 year, charging time for 12 hours.

diesel engine pump start-up battery charging in the end, should check the electrolyte level, enough to join the correct proportion (when necessary 1-1. 28) The standard of electrolyte.


The manufacture marketing game of submersible pump is changing with each innovation, and businesses of all products need to be ready to pounce.
J&T INDUSTRY CO.,LTD.’s goal is to provide the customer with an enjoyable, honest service by satisfying individual customers practical transportation needs with a quality product.
J&T INDUSTRY CO.,LTD. knew the only way to remain competitive was to ensure quality of service and customer satisfaction above all.
Regularly improving submersible pump in accordance with customer feedback is a great way to show your brand listens and cares.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: